This summer, wireless was installed in all the residence halls at main campus. In the fall, we will be replacing wireless in the academic areas/buildings and upgrading wireless and bandwidth at the Columbus Center and at some other locations. In the spring, we will install wireless in the administrative areas/buildings on main campus.